More progress with the doors going up that form the egress path, out of ERIT in case of fire:
And a look from wall to wall:
Tuesday, April 23, 2013
Wednesday, April 17, 2013
New wiring going in place
Each day brings us closer to finishing the ERIT project. This is NOT a mancave, but will be the ERIT workroom for the hardware activity that needs to take place. This is the materials currently in room 64 downstairs next to the bindery that will be converted into a training room with grant money for digital literacy training.
Thus the need for extra wiring that is being run from ERIT into the IT closet in room 216. This is pulling wires above Darinlee's desk.
This is the conduit installed to move the additional wiring into the IT closet.
And this is the hub they are going to:
Thus the need for extra wiring that is being run from ERIT into the IT closet in room 216. This is pulling wires above Darinlee's desk.
This is the conduit installed to move the additional wiring into the IT closet.
And this is the hub they are going to:
Tuesday, April 9, 2013
Painting has begun
Painting has begun in the ERIT suite and you will notice that the colors are similar to the colors on the third floor in SCUA. This was by design so that the building will have a consistant look in renovated areas.
Tuesday, April 2, 2013
New Stuff has Arrived
ERIT is starting to get some new items to rebuild the new space. Here are the side windows for the offices and conference room:
And these are the cabinets which face into the back of the department:
This is more ceiling shots on wiring etc. going on above the ceiling tile:
And a broader look at how things are progressing:
And these are the cabinets which face into the back of the department:
This is more ceiling shots on wiring etc. going on above the ceiling tile:
And a broader look at how things are progressing: