Thanks for your patience last week, it was loud and dusty. This is mostly due to the fact that the contractors put extra people on the job to get as much drilling and demo work done (while students were out) as possible. There was also alot of core drilling for the piping that is needed to move water from basement to third floor. This is an example of the new pipes running across the ceiling.
No comments:
Post a Comment